|
|
|
Hermes Business Campus
5-7 Dimitrie Pompei Blvd
Bucharest
|
Property Type
- Office
Property Size
- 58,000 m²
- Available Space
- 750 m² - 19,000 m²
- Tenure
- Lease
- Availability
- Under Construction Phase I Due For Completion 2013
|
Headlines -
State of the art, high quality office project offering flexible occupier solutions to be delivered in several Phases -
Large, modern, efficient and flexible floor plates up to 2,000m² -
Located on boulevard Dimitrie Pompeiu at the heart of Bucharest’s business district with good public transport provisions -
BREEAM Ecological Standard being delivered through design phase to the highest standards Location Building description -
The scheme will be developed in 3 phases with Phase I ( Building B) providing approximately 19,000m² built over 4 basement levels, ground and 8 upper levels -
Floor plates have been designed to provide maximum efficiency and accommodate up to 2,000m² per level with flexibility to sub-divide individual floors -
Innovative design affords occupiers quality and high standards of functional space including high quality air handling, natural light provision and acoustics Restaurant and service related amenities within Ground Floor of the scheme. -
4 levels of basement car parking -
Archive and remote storage facilities -
Hermes Business Campus benefits from First Class public transport provisions including immediate access to Metro (Pipera Station), Tram and Bus access. -
Good parking ratios 1:60m² of offices Technical Description - Full high tech BMS (Building Management System)
Access control for parking areas - Control of office lighting via “dimmers” regulated by ambient ligh
- Air conditioning by radiant cooling ceilings
- Double flow ventilation system for comfort in the event of maximum density
- Raised access floors
- Suspended ceilings with integrated lighting system
|
|
|
|